APPLIED A NEW METHOD FOR MULTI-MODE PROJECT SCHEDULING

Print
The aim of this paper is to present a modelling heuristic framework that enables one to cope with a problem of a project-driven manufacturing. The objective is to find computationally effective method aimed at scheduling of a new project subject to constraints imposed by a multi-project environment. The application of a heuristic method of scheduling is demonstrated on one example of a makespan-feasible schedule that follows the constraints imposed by the precedence relation and by the time-constrained resources availability. This heuristic method is based on concept of critical path and branch and bound scheme.